Our activities

Our passionate people

GPAI carries out your industrial projects from design to installation and commissioning.

Our team, composed of 26 passionate people, has the strength of long experience in industrial electricity solutions, automation, instrumentation and piping.

The priority for our engineers and technicians is to offer our customers all-in solutions that are a precise match for their needs through: an attentive ear, mobilising technical skills and expertise, using innovative technology, and high quality execution.

Florent

I joined GPAI in 2017. I cable electrical cabinets for the gas, food, brewing and cosmetic industries. I am discovering just how many applications our products have.

Pierre

I joined the team in 2011. I am in charge of commercial relations with our customers in the medical, conveyance and steel sectors.

Stéphane

A member of GPAI since 2019, I am responsible for validating medical equipment.

Mathias

Hired in 2017 after studying to be an engineer, I am a project manager in industrial electricity. I specialise in designs, studies, plans and carrying out industrial electricity projects.

Antoine

Je suis câbleur en électricité industrielle depuis 2015. Je participe à l’assemblage d’armoires de puissance dont j'assure la mise en service

Jolan

I joined GPAI in August 2020. I specialize in cabinet wiring for medical applications. I pay attention to the aesthetics aspects of my work.

Bernard C.

With a Bachelor’s degree in electromechanics, I joined GPAI in 2024 as a project manager

Alexis

Technical director since GPAI’s foundation in 2010, I am in charge of projects that combine process, electricity and automation. I am the technology expert at the company.

Our customers

  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

latest news

Plastic food film extruder

Plastic food film extruder

18/062025

GPAI is refurbishing a polypropylene extrusion line by adding automatic dosing, continuous thickness measurement, and fluff recycling. The production target is achieved as soon as the restart.

see more